News

Biogas plant Bergwinkel (Saxony-Anhalt) was tested on 03/21/2012 and approved by TÜV Thuringia.

 

Biogas plant Oberwellenborn was equipped with an additional 366kW cogeneration of electric power. Thus, the biogas plant has a total capacity of 600KW + 366kW = 966kW. The extension was  inspected and approved by TÜV Thuringia on 03/26/2012.

 

Actually there are 14.902kW continuous electrical power on the network generated by ibes biogas plants.

In planning or under construction are more than 1.413kW!